PROJECT
|
DESCRIPTION
|
YEAR
|
|
Riser Pipe Replacement
|
12th tier domestic water riser lines replaced
|
2020
|
|
Riser Pipe Replacement
|
09 tier domestic water riser lines replaced
|
2019
|
|
Domestic
Basement Pipe Replacement
|
All horizontal
domestic water pipe
lines in the Bader basement replaced
|
2018
|
|
Boiler and hot water heater replacement
|
Two domestic hot water heaters and two Camus boilers, which provide heating for the building were replaced
|
2017
|
|
LED Lighting Retrofit
|
Common area fixture repair and replacement, LED
lighting installed
|
2016
|
|
Facade Restoration
|
Repointed, recaulked, replaced damaged brick, sealed
cement
|
2016
|
|
Solar Panel Addition
|
Solar panels added to roof to augment water heaters
|
2015
|
|
Chiller Replacement
|
New chiller installed, upgrades in associated
plumbing, related electrical work, removal of old
plumbing and air handling equipment
|
2013
|
|
Common Area Redecoration
|
Unit front doors replaced with fire rated doors, door
hardware replaced, hall, lobby, and stairwell lighting
replaced, halls and lobby painted, hall carpeting
replaced, new art hung in lobby and elevator lobbies
|
2013
|
|
Domestic Hot Water Boiler Replacement
|
Two flash boilers installed, upgrades in associated
plumbing, related electrical work, removal of old
boilers and plumbing
|
2010
|
|
Stairwell Door Replacement
|
All stairwell doors for both stairwells replaced
with fire rated doors
|
2010
|
|
Cooling Tower Replacement
|
Roof top cooling tower replaced, spring isolators
installed to reduce roof vibration
|
2010
|
|
Fire Alarm System Replacement
|
New fire alarm panel, pull stations, horn/strobes,
smoke detectors, heat detectors, annunciator panel
|
2004
|
|
Flashing Installation
|
Recaulked and added flashing to 06 tier windows
|
2003
|
|
Roof Deck Replacement
|
Roof deck redesigned and replaced, modular design
so can be taken apart and put back after next roof
replacement
|
2003
|
|
Roof Replacement
|
Roof slope redesigned and roof replaced
|
2002
|
|
Elevator Cab Replacement
|
Elevators completely replaced including converting the
manual elevator to an automatic passenger cab
|
1991
|